We spent most of the September 2019 work party smoothing and grass-seeding Whitehouses, and the offside bank all the way back to Bridge 4.  Everything up there has been removed, including the access ramp to it.  Some final excavated spoil was dug out of the canal-bed between Bridge 4 part-way to Little Tring, and placed up there. Tony’s report is below.