January 2020, Concreting under Bridge 4

The January work party was largely spent under Bridge 4.  In the first 2 pictures below by Steve Bonser, we were concrete blocking on top of the usual lining.  Later in the week we covered some of the centre of the canal with ready-mix, this acting as pipe-capping, and the rest to follow next month.  Chris Sargeant supplied the second pair of pictures showing the grass growing on the offside bank to Whitehouses, and the Tidy Friday bonfire. For Tony’s Operations Report, click on the link below.