August 2019 – Strengthening and Top-soiling

August 2019’s 2-week work party:  1) Strengthened in front of the Bridge 4 mooring wall; 2) Top-soil on the excavated material beyond Whitehouses, so that it can be incorporated into the field which the County Council leases to the local farmer; plus 3) further excavation.  Pictures by Chris Sargeant and Steve Bonser. Tony’s monthly report is below.