During our June work party, lining and blocking has reached Bridge 4, as shown in the pictures on the right, thanks to Steve Bonser. Tony’s monthly report is below.
We have also recently been sent a link to a beautiful video produced by one of our supporters, showing the restored arm between Drayton Beauchamp and Bridge 4A – a big thank you to Mike Osborn, the link is here .